Union-built 310-MW solar + storage project comes online in California

The Athos III solar project (also known as Blythe Mesa Solar II) generates 224 MWAC/310 MWDC of solar energy, enough to power 94,000 homes.

Intersect Power started the commercial operation of its Athos III solar project in Riverside County, California, on December 22, 2022. The Athos III solar project was built by union labor, with American-made solar panels, batteries and steel piles, and it is expected to meet the domestic content and prevailing wage requirements for tax credit incentives in the Inflation Reduction Act (IRA).

The Athos III solar project (also known as Blythe Mesa Solar II) generates 224 MWAC/310 MWDC of solar energy, enough to power approximately 94,000 homes, and features 448 MWh of co-located storage.

Click here to read the full article
Source: Solar Power World

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *