Super Bowl LVIII powered entirely by Nevada solar-plus-storage project

Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada.

Super Bowl LVIII was powered entirely by renewable power, with an EDF Renewables solar-plus-storage project in Nevada meeting the energy demands of the final game of the 2023 NFL season.

The game, which took place on 11 February, 2024, at Allegiant Stadium in Las Vegas, Nevada, required 28MWh of electricity, according to climate tracker NZero, which was provided by EDF’s Arrow Canyon project. The solar-plus-storage project has a power generation capacity of 275MW, alongside a 5-hour battery energy storage (BESS) facility with a capacity of 75MW, which reached commercial operation last November.

Click here to read the full article
Source: PV Tech

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *