ptp-013123-2

Wood Mackenzie found that reaching 100% renewable electricity would require adding 200,000 miles of high-voltage transmission lines

Wood Mackenzie found that reaching 100% renewable electricity would require adding 200,000 miles of high-voltage transmission lines

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *