ptp-071222-5

The microgrid system will launch in September in Silver Spring, powering electric buses on Montgomery County’s Ride On system

The microgrid system will launch in September in Silver Spring, powering electric buses on Montgomery County’s Ride On system

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *