BLM approves 300-MW Sunlight Storage II project in Southern California
A NextEra Energy Resources subsidiary won approval from the US BLM to build a 300 MW battery energy storage project at a solar farm in CA’s desert.
This author has not written his bio yet.
But we are proud to say that Panel The Planet contributed 877 entries already.
A NextEra Energy Resources subsidiary won approval from the US BLM to build a 300 MW battery energy storage project at a solar farm in CA’s desert.
States are actively working on ways to recover valuable materials from decommissioned solar panels and minimize the disposal of hazardous components.
The initial segment of the country’s most expensive infrastructure project, California’s bullet train, is getting a utility-scale solar power system.
The CAISO set a new solar peak generation record for the 3rd month in a row, as solar output reached the highest level on record so far this month.
For the first time in US history, US-made wind and solar components are now cheaper than imports, according to a new study.
A new solar-powered energy storage plant that recently opened in Cicero is the first of its kind in the country.
Short Hills, NJ is now host to an active 8.9 MW floating solar farm – the largest floating solar array in North America.
Construction has begun on the Fresno Disadvantaged Community (DAC) Solar Farm, the largest shared solar project for disadvantaged communities in CA.
The Bureau of Land Management is advancing construction for its energy storage system, furthering the energy capacity of the Desert Sunlight Solar Farm.
The CEC approved a state load shift goal of 7,000 MW by 2030, which is double current levels of demand flexibility and could power up to 7 million homes by the end of the decade without new power plants.